There are no call materials at this time.

There are no exposure drafts at this time.

2014 RBC Proposal Form

List of Catastrophe Events for 2017

Related NAIC Publications

Contacts

Catastrophe Risk (E) Subgroup

 

2017 Charges:

  1. Recalculate the premium risk factors on an ex-catastrophe basis, if needed.

  2. Continue to update the U.S. and non-U.S catastrophe event list.

  3. Continue to evaluate the need for exemption criteria for insurers with minimal risk.

  4. Evaluate the RBC results inclusive of a catastrophe risk charge.

  5. Refine instructions for the catastrophe risk charge.

  6. Continue to evaluate any necessary refinements to the catastrophe risk formula.

  7. Evaluate other catastrophe risks for possible inclusion in the charge.

2018 Proposed Charges

The Catastrophe Risk (E) Subgroup of the Property and Casualty Risk-Based Capital (E) Working Group will:

  1. Recalculate the premium risk factors on an ex-catastrophe basis, if needed.

  2. Continue to update the U.S. and non-U.S catastrophe event list.

  3. Continue to evaluate the need for exemption criteria for insurers with minimal risk.

  4. Evaluate the risk-based capital (RBC) results inclusive of a catastrophe risk charge.

  5. Refine instructions for the catastrophe risk charge.

  6. Continue to evaluate any necessary refinements to the catastrophe risk formula.

  7. Evaluate other catastrophe risks for possible inclusion in the charge.

Catastrophe Event List Process

 

Please refer to the Frequently Asked Questions for more information.